by Toni Takacs | Jan 27, 2022
Zionsville, IN
Creekside Corporate Park
HWC provided project management, project engineering, survey, and construction inspection services for the Creekside Corporate Park Project in Zionsville, Indiana.
A conservation office park, Creekside includes corporate headquarters and office buildings built alongside beautiful ravines and woodlands.
The development includes several amenities in the open space areas, including trails and a fitness pocket park. The trail system includes nearly 3,750’ of paths and six pedestrian bridges within the natural open space, in addition to a pathway system along roadways.
by Toni Takacs | Jan 13, 2022
Noblesville, IN
Union Chapel
This project was a commercial subdivision with three lots. Lot 1 is a commercial retail center with offices and a drive-through dining business. Lot 2 is a large self-storage facility, and Lot 3 is a Goddard early childhood center.
Each of the lots have entrances to the adjoining city streets and required modifications to the existing pedestrian pathways. The overall site was designed with public utilities for storm sewer, sanitary sewer, and water main extensions. A large stormwater detention pond was also designed to provide the necessary stormwater detention and provide dirt for the lots.
Recent Comments